<div>The Department of Veterans Affairs (VA) established an appointment scheduling process for the Veterans Community Care Program (VCCP) that allows up to 19 days to complete several steps from VA providers creating a referral to community care staff reviewing that referral. However, as the figure shows, VA has not specified the maximum amount of time veterans should have to wait to receive care through the program. GAO previously recommended in 2013 the need for an overall wait-time measure for veterans to receive care under a prior VA community care program. Subsequent to VA not implementing this recommendation, GAO again recommended in 2018 that VA establish an achievable wait-time goal as part of its new community care program (the VCCP). Potential Allowable Wait Time to Obtain Care through the Veterans Community Care Program Note: This figure illustrates potential allowable wait times in calendar days for eligible veterans who are referred to the VCCP through routine referrals (non-emergent), and have VA medical center staff—Referral Coordination Team (RCT) and community care staff (CC staff)—schedule the appointments on their behalf. VA has not yet implemented GAO's 2018 recommendation that VA establish an achievable wait-time goal. Under the VA MISSION Act, VA is assigned responsibility for ensuring that veterans' appointments are scheduled in a timely manner—an essential component of quality health care. Given VA's lack of action over the prior 7 years implementing wait-time goals for various community care programs, congressional action is warranted to help achieve timely health care for veterans. Regarding monitoring of the initial steps of the scheduling process, GAO found that VA is using metrics that are remnants from the previous community care program, which are inconsistent with the time frames established in the VCCP scheduling process. This limits VA's ability to determine the effectiveness of the VCCP and to identify areas for improvement. In June 2019, VA implemented its new community care program, the VCCP, as required by the VA MISSION Act of 2018. Under the VCCP, VAMC staff are responsible for community care appointment scheduling; their ability to execute this new responsibility has implications for veterans receiving community care in a timely manner. GAO was asked to review VCCP appointment scheduling. This report examines, among other issues, the VCCP appointment scheduling process VA established and VA's monitoring of that process. GAO reviewed documentation, such as scheduling policies, and referral data related to the VCCP and assessed VA's relevant processes. GAO conducted site visits to five VAMCs in the first region to transition to VA's new provider network, and interviewed VAMC staff and a non-generalizable sample of community providers receiving referrals from those VAMCs. GAO also interviewed VA and contractor officials. GAO recommends that Congress consider requiring VA to establish an overall wait-time measure for the VCCP. GAO is also making three recommendations to VA, including that it align its monitoring metrics with the VCCP appointment scheduling process. VA did not concur with one of GAO's recommendations related to aligning monitoring metrics to VCCP scheduling policy time frames. GAO continues to believe this recommendation is valid, as discussed in the report. For more information, contact Sharon M. Silas at (202) 512-7114 or silass@gao.gov.</div>

What GAO Found

The Department of Veterans Affairs (VA) established an appointment scheduling process for the Veterans Community Care Program (VCCP) that allows up to 19 days to complete several steps from VA providers creating a referral to community care staff reviewing that referral. However, as the figure shows, VA has not specified the maximum amount of time veterans should have to wait to receive care through the program. GAO previously recommended in 2013 the need for an overall wait-time measure for veterans to receive care under a prior VA community care program. Subsequent to VA not implementing this recommendation, GAO again recommended in 2018 that VA establish an achievable wait-time goal as part of its new community care program (the VCCP).

Potential Allowable Wait Time to Obtain Care through the Veterans Community Care Program

Note: This figure illustrates potential allowable wait times in calendar days for eligible veterans who are referred to the VCCP through routine referrals (non-emergent), and have VA medical center staff—Referral Coordination Team (RCT) and community care staff (CC staff)—schedule the appointments on their behalf.

VA has not yet implemented GAO’s 2018 recommendation that VA establish an achievable wait-time goal. Under the VA MISSION Act, VA is assigned responsibility for ensuring that veterans’ appointments are scheduled in a timely manner—an essential component of quality health care. Given VA’s lack of action over the prior 7 years implementing wait-time goals for various community care programs, congressional action is warranted to help achieve timely health care for veterans.

Regarding monitoring of the initial steps of the scheduling process, GAO found that VA is using metrics that are remnants from the previous community care program, which are inconsistent with the time frames established in the VCCP scheduling process. This limits VA’s ability to determine the effectiveness of the VCCP and to identify areas for improvement.

Why GAO Did This Study

In June 2019, VA implemented its new community care program, the VCCP, as required by the VA MISSION Act of 2018. Under the VCCP, VAMC staff are responsible for community care appointment scheduling; their ability to execute this new responsibility has implications for veterans receiving community care in a timely manner.

GAO was asked to review VCCP appointment scheduling. This report examines, among other issues, the VCCP appointment scheduling process VA established and VA’s monitoring of that process.

GAO reviewed documentation, such as scheduling policies, and referral data related to the VCCP and assessed VA’s relevant processes. GAO conducted site visits to five VAMCs in the first region to transition to VA’s new provider network, and interviewed VAMC staff and a non-generalizable sample of community providers receiving referrals from those VAMCs. GAO also interviewed VA and contractor officials.

What GAO Recommends

GAO recommends that Congress consider requiring VA to establish an overall wait-time measure for the VCCP. GAO is also making three recommendations to VA, including that it align its monitoring metrics with the VCCP appointment scheduling process. VA did not concur with one of GAO’s recommendations related to aligning monitoring metrics to VCCP scheduling policy time frames. GAO continues to believe this recommendation is valid, as discussed in the report.

For more information, contact Sharon M. Silas at (202) 512-7114 or silass@gao.gov.

News Network

  • Sanctioning Cuban Officials in Response to Violence against Peaceful Protestors
    In Crime Control and Security News
    Antony J. Blinken, [Read More…]
  • Secretary Blinken’s Call with Colombian Foreign Minister Blum
    In Crime Control and Security News
    Office of the [Read More…]
  • On the United Kingdom’s Establishment of a Global Anti-Corruption Sanctions Regime
    In Crime Control and Security News
    Antony J. Blinken, [Read More…]
  • Antitrust Division and Fellow Members of the Multilateral Pharmaceutical Merger Task Force Seek Public Input
    In Crime News
    The U.S. Department of Justice’s Antitrust Division is pleased to be a part of the Multilateral Pharmaceutical Merger Task Force (Task Force), along with its counterpart competition enforcement agencies — the Federal Trade Commission (FTC), the Canadian Competition Bureau, the European Commission Directorate General for Competition, the United Kingdom’s Competition and Markets Authority, and Offices of State Attorneys General.
    [Read More…]
  • Attorney General Merrick Garland Addresses the 115,000 Employees of the Department of Justice on His First Day
    In Crime News
    Former Acting U.S. Attorney General Monty Wilkinson’s Remarks Good morning. It's my honor to welcome Merrick Garland back to the Department of Justice as the 86th Attorney General of the United States. I'd also like to recognize the Attorney General's wife Lynn, his brother-in-law Mitchell and his nieces Laura and Andrea. In many respects, this is a welcome home ceremony for the Attorney General. Before his appointment to the U. S. Court of Appeals for the District of Columbia Circuit, he served with distinction in a number of positions here at Main Justice and as an Assistant U. S. Attorney in the District of Columbia.
    [Read More…]
  • Transportation Research: Additional Actions Could Improve DOT’s Internal Collaboration and Reliability of Information on Research Activities
    In U.S GAO News
    The Department of Transportation (DOT) uses a multistep, centralized process to prioritize and select research activities it will fund. DOT's modal administrations—which focus on specific modes of transportation like air, rail, and highways—conduct and manage most of DOT's research. The modal administrations GAO spoke to used a variety of methods to prioritize and select research, including soliciting stakeholders' feedback on research needs. The Office of the Assistant Secretary for Research and Technology (OST-R) is responsible for reviewing this proposed research to ensure alignment with DOT's strategic plans and to prevent duplicative research efforts, as required by statute. DOT has multiple efforts to facilitate research collaboration both externally and internally, but in guidance to promote collaboration, OST-R did not incorporate all leading practices. Specifically, OST-R established topical-research working groups on 12 multimodal subject areas in October 2018 and issued accompanying guidance. This guidance incorporated some leading collaboration practices, such as directing working groups to identify leadership roles and relevant participants. However, the guidance did not incorporate two leading practices—defining and monitoring progress toward long-term outcomes and regularly updating and monitoring written agreements. Taking steps to ensure the working groups follow these practices could provide OST-R greater assurance that the groups coordinate their efforts effectively, better plan long-term research, and better position themselves to address future transportation challenges. OST-R has taken some steps to help ensure that its public database on DOT-funded research projects (the Research Hub) contains complete and accurate information, as required by DOT's data management policy; however, data reliability issues remained. For example, as of July 2019—the latest available data at the time of GAO's analysis—36 percent of records in the database were missing research partners' contact information, hindering the research community's ability to obtain current project details. Taking additional steps, such as providing instructions to the modal administrations on how to improve the completeness and accuracy of the information they give OST-R for the Research Hub, would help ensure the database is fulfilling DOT's intended purpose that it serve as a reliable source of information on the department's research portfolio. Examples of Research Activities on Advanced Driver-Assistance Systems and Connected Vehicles Funded by the U.S. Department of Transportation DOT's research activities are critical to DOT's mission to make the nation's transportation system safer and more efficient. To meet current research needs and prepare for emerging technologies, DOT partners with public and private entities. In fiscal year 2018, DOT funded about 2,300 partners and had a research budget exceeding $1 billion. GAO was asked to review DOT's research activities. This report addresses: (1) how DOT prioritizes and selects which research activities it will undertake; (2) the extent to which DOT facilitates research collaboration with external stakeholders and across the department; and (3) the extent to which DOT ensures its Research Hub database contains complete and accurate project information. GAO reviewed documents and analyzed data from DOT; observed DOT-funded research; interviewed DOT officials from OST-R and four selected modal administrations; and used GAO's leading collaboration practices to assess the extent of collaboration. GAO also interviewed 17 DOT research partners, including universities and associations. GAO recommends that OST-R (1) take steps to ensure the topical-research working groups follow all leading collaboration practices, and (2) take additional steps to ensure the information in the Research Hub is complete and accurate. DOT concurred with GAO's recommendations. For more information, contact Elizabeth Repko at (202) 512-2834 or repkoe@gao.gov.
    [Read More…]
  • Attorney General William Barr Delivers Video Remarks for the Virtual National Law Enforcement Training on Child Exploitation
    In Crime News
    Good morning, the Department of Justice is pleased to once again host the National Law Enforcement Training on Child Exploitation.
    [Read More…]
  • Norwegian National Day
    In Crime Control and Security News
    Antony J. Blinken, [Read More…]
  • Department of Defense: Actions Needed to Improve Accounting of Intradepartmental Transactions
    In U.S GAO News
    The Department of Defense (DOD) has a long-standing material weakness related to intradepartmental transactions. Intradepartmental transactions occur when trading partners within the same department engage in business activities—such as the Department of the Army as a seller and the Department of the Navy as a buyer within DOD. As part of the standard process of preparing department-wide financial statements, intradepartmental transaction amounts are eliminated to avoid overstating accounts for DOD. For the fourth quarter of fiscal year 2019, DOD eliminated approximately $451 billion of net intradepartmental activity. Auditors continue to report a material weakness related to DOD's processes for recording and reconciling intradepartmental transaction amounts that are necessary to eliminate the transactions and prepare reliable consolidated financial statements. DOD has identified implementation of the Government Invoicing (G-Invoicing) system as its long-term solution to account for and support its intradepartmental activities. In fiscal year 2020, DOD issued a policy requiring all DOD components to use G-Invoicing's General Terms and Conditions (GT&C) functionality for initiating and approving GT&C agreements—a necessary step for using subsequent G-Invoicing functionalities (see figure). GAO found the use of this functionality varied among selected DOD components because of issues such as inconsistency in DOD policies and numerous changes to G-Invoicing system specifications. If DOD components do not implement the GT&C functionality, there is an increased risk of delay in full implementation of G-Invoicing to help remediate the intradepartmental eliminations material weakness. General Terms and Conditions Agreement Process in Government Invoicing Although DOD has identified G-Invoicing as its long-term solution, GAO found that DOD has not implemented an overall department-wide strategy to address its intradepartmental eliminations material weakness in the short term. Further, GAO found that while DOD issued a department-wide policy in May 2019 with new requirements for reconciling intradepartmental transactions, the Defense Finance and Accounting Service and selected DOD components have not updated their policies or implemented several of the new requirements. Without a short-term strategy that includes identifying the causes of issues and consistently implementing department-wide policies across DOD, DOD's efforts to resolve differences in intradepartmental transaction amounts—including its efforts in the long term—will likely be inefficient and ineffective. Since 1995, GAO has designated DOD financial management as high risk because of pervasive weaknesses in its financial management systems, controls, and reporting. DOD's long-standing intradepartmental eliminations material weakness reflects DOD's inability to adequately record and reconcile its intradepartmental transactions, and has affected DOD's ability to prepare auditable financial statements. GAO was asked to evaluate DOD's process for performing intradepartmental eliminations. This report examines the extent to which DOD has (1) identified and taken steps to address issues related to intradepartmental eliminations and (2) established and implemented policies and procedures related to intradepartmental eliminations. GAO interviewed DOD officials about intradepartmental eliminations processes and reviewed DOD policies and procedures to identify the extent to which procedures have been implemented to record and reconcile intradepartmental transactions. GAO is making five recommendations to DOD, including that DOD should (1) take actions to ensure that its components follow its policy for using G-Invoicing's GT&C functionality and (2) develop short-term solutions that address causes for trading partner differences before G-Invoicing is fully implemented. DOD agreed with all five recommendations and cited actions to address them. For more information, contact Kristen Kociolek at (202) 512-2989 or kociolekk@gao.gov.
    [Read More…]
  • Former City Officials Sentenced for Accepting Bribes in Exchange for Cannabis Dispensary Permit
    In Crime News
    Two California men were each sentenced today to two years in prison for accepting bribes in return for a guarantee of a city permit to open a commercial cannabis dispensary.
    [Read More…]
  • Bank Julius Baer Agrees to Pay More than $79 Million for Laundering Money in FIFA Scandal
    In Crime News
    Bank Julius Baer & Co. Ltd. (BJB or the Bank), a Swiss bank with international operations, has admitted today in federal court in Brooklyn that it conspired to launder over $36 million in bribes through the United States to soccer officials with the Fédération Internationale de Football Association (FIFA) and other soccer federations, in furtherance of a scheme in which sports marketing companies bribed soccer officials in exchange for broadcasting rights to soccer matches. The proceeding was held before U.S. District Judge Pamela K. Chen.
    [Read More…]
  • Indian Education: Schools Need More Assistance to Provide Distance Learning
    In U.S GAO News
    What GAO Found The Bureau of Indian Education (BIE), within the Department of the Interior (Interior), has not provided BIE-funded schools with comprehensive guidance on distance learning during the COVID-19 pandemic. In March 2020, BIE issued a short memo directing schools to “deliver flexible instruction” and “teach content,” but did not offer specific guidance on how to do so. In July 2020, 13 of the 25 schools that responded to GAO's survey said they wanted BIE to provide information on developing and implementing distance learning programs. In addition, 12 schools responded that they wanted information on distance learning methods for areas without broadband internet access. In August 2020, after some schools had already begun the school year, BIE issued a re-opening guide for the 2020-2021 school year. BIE's guidance focused primarily on preparations for in-person instruction at schools, although nearly all schools provided distance learning during the fall of 2020. The guidance contained little information on distance learning. Providing schools with comprehensive distance learning guidance will help them better navigate the current pandemic as well as potential future emergencies that lead to school building closures. BIE helped improve internet access for students at BIE-operated schools during the pandemic, but many students had not received laptops to access online learning by the end of fall 2020. BIE and other Interior offices provided over 7,000 hotspots to students to improve home internet access, but they did not order laptops for most students until September 2020. Interior officials said a nationwide IT supply shortage contributed to the delayed order for about 10,000 laptops. GAO found, however, that delays were also caused in part by BIE not having complete and accurate information on schools' IT needs. Most schools received laptops from late October 2020 to early January 2021, although some laptops still had not been delivered as of late March 2021. Once laptops were delivered, however, schools also faced challenges configuring them, leading to further delays in distributing them to students. BIE officials told GAO that to address schools' challenges with configuring laptops, they are assessing schools' IT workforce needs. Most BIE students did not receive laptops until months after the school year began, according to GAO's analysis of Interior information. Specifically, none of the laptops Interior ordered in early September 2020 arrived in time to distribute to students by the start of the school year in mid-September; by the end of December 2020, schools had not distributed over 80 percent of the student laptops Interior ordered; and as of late March 2021, schools had not distributed about 20 percent of the student laptops Interior ordered. Without accurate, complete, and up-to-date information on schools' IT needs, BIE was unable to ensure that students received laptops when they needed them. Establishing policies and procedures for assessing schools' IT needs would help guide the agency's IT purchases now and in the future, and position schools to integrate technology into their everyday curricula. Why GAO Did This Study BIE's mission is to provide quality education to approximately 41,000 students at 183 schools it funds on or near Indian reservations in 23 states. About two-thirds of these schools are operated by tribes and the remaining third are operated by BIE. In March 2020, all BIE schools closed their buildings in response to the COVID-19 pandemic. GAO reviewed distance learning at BIE schools as part of its oversight responsibilities under the CARES Act. This testimony examines the extent to which (1) BIE has provided schools with guidance to develop and implement distance learning programs during the COVID-19 pandemic, and (2) students have had the technology they need to participate in such programs. GAO analyzed the guidance BIE provided to schools on distance learning, examined BIE's provision of technology to schools and students, surveyed a non-generalizable sample of 30 schools—including 19 operated by tribes and 11 operated by BIE— with 25 schools responding, selected for geographic diversity and level of community broadband access, among other criteria, reviewed relevant federal statutes, regulations, and agency documentation, and interviewed BIE and school officials.
    [Read More…]
  • Lead Paint in Housing: Key Considerations for Adopting Stricter Lead Evaluation Methods in HUD’s Voucher Program
    In U.S GAO News
    What GAO Found GAO found that the Housing Choice Voucher program had 1.1 million voucher holders living in units built before 1978, the year the U.S. banned lead paint in housing. Of these units, roughly 171,000 were occupied by approximately 229,000 young children (under age 6)––putting these children at an increased risk of lead exposure. The voucher program requires visual assessments for identifying deteriorated paint, with no testing of paint or dust. Any change to stricter evaluation methods would need to consider that certain states have a larger portion of pre-1978 voucher units occupied by families with young children. Estimated costs for adopting stricter lead evaluation methods for the voucher program would vary substantially depending on the method used and what units were included (see figure). Estimated initial costs range from about $60 million for a less expensive method applied only to units with young children to about $880 million for a more expensive method applied to all pre-1978 units. These estimated costs range from 3 percent to 41 percent, respectively, of the fiscal year 2021 budget dedicated to public housing agencies' administrative expenses for the voucher program. Total costs would also depend on the mobility of voucher households and the frequency of any additional lead evaluations. Total Estimated Cost to Change the Lead Evaluation Methods for Housing Choice Voucher Units Would Vary by Evaluation Method Used and Units Included Note: A combination evaluation includes all components of a lead inspection and a risk assessment. Estimated costs may vary by up to plus or minus 14 percentage points at the 95 percent level of confidence. GAO analysis estimated that nearly 6,000 lead professionals can conduct lead evaluations in the U.S. While there is no indication of a national shortage of lead professionals, areas with high numbers of pre-1978 voucher units and low numbers of lead professionals may face implementation challenges. Selected cities offer observations from their implementation of a change in lead evaluation method. For example, education of landlords can help clarify new evaluation requirements and encourage landlords to continue to rent to voucher holders. Further, implementing a new method in phases could target areas with the greatest need and help landlords and the industry adapt to the new requirement and the increased demand for lead evaluations. Why GAO Did This Study Exposure to lead paint, which was used in housing built before 1978, can have serious health effects, especially for young children. The Department of Housing and Urban Development (HUD) has primary responsibility for identifying lead paint hazards in housing receiving HUD assistance, including private rental units in the voucher program. Some members of Congress have raised questions about whether the voucher program should change from visual assessments to a stricter lead evaluation method. The 2017 Consolidated Appropriations Act, Joint Explanatory Statement, includes a provision for GAO to review HUD's efforts to address lead paint hazards. This report identifies considerations for policymakers related to changing to stricter lead evaluation methods for the voucher program, specifically regarding the (1) number and characteristics of voucher housing units and their occupants, (2) costs for lead evaluations based on method used and units included, (3) availability of lead professionals, and (4) observations from selected cities that use lead evaluation methods stricter than visual assessments. GAO analyzed HUD data on the voucher program (as of year-end 2019, the most recent available) and information on lead professionals from the Environmental Protection Agency (EPA) and states. GAO also conducted a nationwide, generalizable survey of lead professionals to estimate the costs of lead evaluation methods. In addition, GAO interviewed staff from HUD, EPA, and public housing agencies, and representatives from two national organizations that represent lead professionals. For more information, contact John H. Pendleton at (202) 512-8678 or pendletonj@gao.gov.
    [Read More…]
  • Secretary Antony J. Blinken on National Land Use, Land Cover, and Ecosystems Monitoring System (SIMOCUTE) Initiative
    In Crime Control and Security News
    Antony J. Blinken, [Read More…]
  • VA COVID-19 Procurements: Pandemic Underscores Urgent Need to Modernize Supply Chain
    In U.S GAO News
    What GAO Found Like most medical institutions nationwide, the Department of Veterans Affairs (VA) faced difficulties obtaining medical supplies, including personal protective equipment for its medical workforce, particularly in the early stages of the COVID-19 pandemic. Long-standing problems with its antiquated inventory management system exacerbated VA's challenges. GAO found VA obligated over $4 billion for COVID-19-related products, such as ventilators, and services, such as information technology to support VA's telework environment, as of May 2021. GAO also found that some vendors were unable to deliver personal protective equipment, which resulted in VA terminating some contracts, particularly early in the pandemic. VA also took additional steps to screen vendors. VA has several initiatives underway to modernize its supply chain and prepare for future public health emergencies, but each faces delays and is in early stages (see figure). For example: Inventory management. VA intended to replace its system with the Defense Medical Logistics Standard Support (DMLSS), with initial implementation in October 2019, and enterprise-wide implementation by 2027. Prior to the pandemic, however, this schedule was at significant risk. VA hopes to accelerate full implementation to 2025, and has received COVID-19 supplemental funds to help, but it is too soon to tell if this will occur. Regional Readiness Centers. VA planned to establish four centers—as central sources of critical medical supplies—by December 2020. As of March 2021, VA has not completed a concept of operations or implementation plan for the project. VA faces an additional year delay in achieving full operational capability, which is now expected in 2023. According to VA officials, the pandemic, among other things, contributed to delays. Warstopper program. VA seeks participation in this Defense Logistics Agency program, which would allow VA emergency access to critical supplies. Legislation recently was introduced to require VA participation. However, as GAO reported in March 2021, several questions remain, such as the range of products the program will cover, the amount of funding needed, and the way the program links to Regional Readiness Centers. Department of Veterans Affairs' Selected Ongoing and New Supply Chain Initiatives, Fiscal Years 2021 through 2028 Why GAO Did This Study In March 2020 and March 2021, Congress appropriated $19.6 billion and $17 billion in supplemental funds, respectively, for VA's COVID-19 response effort. VA also authorized use of emergency flexibilities and automated aspects of its inventory system. In accordance with Congress's direction in the CARES Act to monitor the exercise of authorities and use of funds provided to prepare for, respond to, and recover from the pandemic, relevant committees requested our sustained focus on VA. GAO was asked to assess VA's acquisition management during its COVID-19 pandemic response. This report examines VA's efforts to obtain and track COVID-19-related products and services amid its ongoing struggle to improve its inventory and supply chain management. GAO reviewed federal procurement data, analyzed selected VA contract documents, reviewed selected interagency agreements, assessed VA documents on modernization and other initiatives, and interviewed VA officials and staff.
    [Read More…]
  • Mexican National Day
    In Crime Control and Security News
    Antony J. Blinken, [Read More…]
  • Overseas Conflicts: U.S. Agencies Have Coordinated Stabilization Efforts but Need to Document Their Agreement
    In U.S GAO News
    What GAO Found The Departments of State (State) and Defense (DOD), the U.S. Agency for International Development (USAID), and the U.S. Institute of Peace (USIP)—an independent, federally funded institute—reported conducting various efforts to address conflict prevention, mitigation, and stabilization for Iraq, Nigeria, and Syria in fiscal year 2017. For example, in Iraq, State supported efforts to remove improvised explosive devices from homes and infrastructure (see figure); USAID contributed to the United Nations to restore essential services; DOD provided immediate medical trauma supplies to the World Health Organization to treat injured civilians; and USIP conducted facilitated dialogs to enable local reconciliation in areas liberated from the Islamic State of Iraq and the Levant. Example of U.S. Department of State Stabilization Effort in Iraq In conducting U.S. conflict prevention, mitigation, and stabilization efforts, State, USAID, DOD, and USIP have addressed aspects of key collaboration practices such as elements of bridging organizational cultures and leadership. However, the agencies have not formally documented their agreement on coordination for U.S. stabilization efforts through formal written guidance and agreements that address key collaboration practices. GAO found the following, for example, with regard to the extent key collaboration practices have been used by these entities. Bridging organizational cultures: U.S. agencies have established various mechanisms to coordinate their efforts, such as interagency working groups and staff positions focused on coordination. USIP convenes interagency actors, including State, USAID, and DOD through various programs and events. Defining outcomes and accountability: One or more agencies have established some common outcomes and accountability mechanisms for their stabilization efforts in Iraq, Nigeria, and Syria. Moreover, through an interagency review of U.S. stabilization assistance, State, USAID, and DOD identified a need to develop an outcome-based political strategy outlining end states for U.S. stabilization efforts and strategic analytics to track and measure progress, among other needs. Written guidance and agreements: Although State, USAID, and DOD have developed a framework for stabilization, they have not documented their agreement on the key collaboration practices identified, such as defining outcomes and accountability and clarifying roles and responsibilities. According to key practices for enhancing interagency collaboration, articulating agreements in formal documents can strengthen collaborative efforts, and reduce the potential for duplication, overlap, and fragmentation. Why GAO Did This Study The United States has a national security interest in promoting stability in conflict-affected countries to prevent or mitigate the consequences of armed conflict, according to the 2017 National Security Strategy. State, USAID, and DOD have reported that a collaborative government approach is an essential part of maximizing the effectiveness of U.S. efforts in conflict-affected areas. GAO was asked to review U.S. conflict prevention, mitigation, and stabilization efforts abroad. This report (1) describes examples of conflict prevention, mitigation, and stabilization efforts that U.S. agencies and USIP conducted in Iraq, Nigeria, and Syria and their goals in fiscal year 2017 and (2) examines the extent to which U.S. agencies and USIP incorporated key collaboration practices to coordinate their efforts. GAO collected data from the agencies and USIP on their efforts and goals in Iraq, Nigeria, and Syria. GAO selected these countries based on U.S. national security interests, among other criteria. GAO reviewed agency and USIP documents, interviewed officials, and conducted fieldwork in Iraq, Nigeria, and Jordan. GAO assessed coordination against key practices identified by GAO to enhance interagency collaboration.
    [Read More…]
  • Seventh U.S.-Thailand Strategic Dialogue
    In Crime Control and Security News
    Office of the [Read More…]
  • Deputy Assistant Attorney General for the National Security Division Adam Hickey Delivers Remarks at the ACI 2nd National Forum on FARA
    In Crime News
    Over the last few years, a conventional wisdom has developed about the arc of FARA enforcement.  It goes a little something like this: In the beginning, Congress created FARA. Then DOJ rested.  For nearly 80 years, it was not enforced, carried no penalties, and was largely ignored.  Beginning in 2017, the Special Counsel’s Office used the statute to investigate and charge Russian Internet trolls and politically influential Americans alike.  Suddenly, this vague statute transformed from an administrative afterthought into an unpredictable source of criminal liability.  FARA registrations skyrocketed, and conferences of white collar defense attorneys organized soon thereafter. 
    [Read More…]
  • Ambassador at Large for International Religious Freedom Samuel D. Brownback On the 2020 Ministerial to Advance Freedom of Religion or Belief and the International Religious Freedom or Belief Alliance Ministers’ Forum
    In Crime Control and Security News
    Samuel D. Brownback, [Read More…]
Network News © 2005 Area.Control.Network™ All rights reserved.