[Request for Reconsideration of Sustained Protest of Labor Contract Award]

19 min read
<div>The Department of Labor requested reconsideration of a decision which sustained a protest against a contract award for social services. GAO sustained the protest because of: (1) Labor's agreement with one of two offerers within the competitive range following best and final offers concerning government-furnished property; and (2) a resulting cost analysis which possibly prejudiced the protester. GAO recommended the reopening of negotiations with a clear statement of the requirements and termination of the awardee's contract should the protester's proposal prove more advantageous. Labor requested reconsideration on the grounds that the protester was not prejudiced by the negotiations with the awardee and contended that the recommended corrective action was inappropriate. GAO found that it was not clear that the changes effected by the negotiations were not prejudicial to the protester because a reallocation of savings which followed best and final offers allowed the awardee to reduce its bid. Furthermore, GAO found that Labor presented no convincing evidence that GAO erred in concluding that the protester might have successfully competed had it received the same access to government-owned property which had been developed by the awardee. Therefore, GAO held that the negotiations after best and final offers resulted in a substantial change in contract requirements which possibly prejudiced the protester. Accordingly, GAO affirmed its prior decision; however, since less than 3 months' performance remained on the contract, and Labor had decided not to exercise the contract's option but to issue a new solicitation, GAO had no objection to Labor's not reopening negotiations on the original contract.</div>

B-214564, AUG 27, 1984, 84-2 CPD 228

CONTRACTS – NEGOTIATION – OFFERS OR PROPOSALS – DISCUSSION WITH ALL OFFERORS REQUIREMENT – WHAT CONSTITUTES DISCUSSION – REVISION OF PROPOSAL OPPORTUNITY DIGEST: PROTEST IS SUSTAINED WHERE GAO IN CAMERA EXAMINATION OF DOCUMENTS SHOWS THAT AGENCY REOPENED NEGOTIATIONS WITH ONLY ONE (THE LOWEST PRICED) OF THE TWO OFFERORS REMAINING IN THE COMPETITIVE RANGE FOR THE PURPOSE OF REDUCING PRICE DOWNWARD TO THE LEVEL OF AVAILABLE FUNDING AND IN THE COURSE OF DISCUSSIONS ALTERED THE NATURE OF THE CONTRACT REQUIREMENTS (BY SUBSTITUTING GOVERNMENT-FURNISHED PROPERTY FOR ITEMS WHICH THE SOLICITATION REQUIRED THE CONTRACTOR TO FURNISH, AND APPARENTLY BY REALLOCATING SOME OF THE WORK CALLED FOR), BECAUSE HIGHER PRICED PROTESTING OFFEROR WAS NOT AFFORDED AN OPPORTUNITY TO COMPETE ON THE ALTERED REQUIREMENT AND IT IS NOT CLEAR THAT PROTESTER WAS NOT PREJUDICED.

JOINT ACTION IN COMMUNITY SERVICE, INC.:

JOINT ACTION IN COMMUNITY SERVICE, INC. (JACS), PROTESTS THE DEPARTMENT OF LABOR (LABOR) AWARD OF A COST-REIMBURSEMENT SOCIAL SERVICES CONTRACT TO WOMEN IN COMMUNITY SERVICE, INC. (WICS), UNDER REQUEST FOR PROPOSALS (RFP) NO. IX-84-14 ISSUED BY LABOR’S EMPLOYMENT AND TRAINING ADMINISTRATION, OFFICE OF JOB CORPS, SAN FRANCISCO, CALIFORNIA.

JACS CONTENDS: (1) THAT LABOR IMPROPERLY PROVIDED WICS WITH GOVERNMENT- FURNISHED PROPERTY (GFP); (2) THAT LABOR IMPROPERLY EVALUATED THE STAFF TO VOLUNTEER RATIO OF WICS’S PROPOSAL; AND (3) THAT LABOR IMPROPERLY EVALUATED THE COMPENSATION FOR PROFESSIONAL EMPLOYEES PORTION OF WICS’S COST PROPOSAL.

WE SUSTAIN THE PROTEST FOR TWO REASONS. OUR IN CAMERA REVIEW OF SOURCE SELECTION MATERIALS WHICH LABOR DID NOT DISCLOSE TO EITHER JACS OR WICS REVEALED THAT THE NEGOTIATION WAS DEFECTIVE AND THAT THE PRICE DIFFERENCE BETWEEN THE TWO OFFERORS IS NOT LARGE ENOUGH FOR US TO CONCLUDE WITH CONFIDENCE THAT JACS WAS NOT PREJUDICED BY THE AWARD TO WICS.

BACKGROUND

THE RFP MERGES IN ONE PROCUREMENT THE ACQUISITION OF COUNSELING, PLACEMENT SUPPORT, AND POST-PLACEMENT SUPPORT SERVICES FOR MALE AND FEMALE JOB CORPS ENROLLEES. JACS AND WICS ARE NONPROFIT NATIONAL VOLUNTEER ORGANIZATIONS WHICH HAVE BEEN, SINCE THE 1960’S, PRIMARY JOB CORPS CONTRACTORS. JACS ASSISTED YOUNG MEN WHILE WICS ASSISTED YOUNG WOMEN. THE BULK OF THE ASSISTANCE IS PROVIDED BY VOLUNTEERS, ALTHOUGH BOTH ORGANIZATIONS MAINTAIN SMALL PROFESSIONAL STAFFS. PREVIOUS GOVERNMENT CONTRACTS HAVE REQUIRED THE COMPILATION AND SUBMISSION OF VOLUNTEER LISTS. THE VOLUNTEER LISTS CONTAIN THE NAMES OF INDIVIDUALS, ACROSS THE COUNTRY, WHO HAVE BOTH TRAINING AND EXPERIENCE IN PROVIDING THE RFP REQUIRED SERVICES TO THE RESPECTIVE JACS AND WICS CONSTITUENCIES; AND WHO ARE WILLING TO FURNISH THOSE SERVICES AT NO COST TO THE GOVERNMENT, SAVE EXPENSES. LABOR REPORTS THAT THESE LISTS ARE GOVERNMENT PROPERTY.

UNDER THE RFP THE CONTRACTOR IS RESPONSIBLE FOR THE PROVISION OF PERSONNEL, OFFICE FACILITIES AND EQUIPMENT.

JACS AND WICS WERE THE ONLY OFFERORS. AFTER INITIAL EVALUATION, BOTH PROPOSALS WERE WITHIN THE COMPETITIVE RANGE FOR FURTHER NEGOTIATIONS. FOLLOWING WRITTEN AND ORAL DISCUSSIONS, BOTH ORGANIZATIONS SUBMITTED BEST AND FINAL OFFERS (BAFO). LABOR EVALUATED THE BAFO’S AND JUDGED THEM SUBSTANTIALLY EQUAL ON TECHNICAL MERIT; HOWEVER, WICS’S EVALUATED COST WAS APPROXIMATELY 17 PERCENT LOWER THAN JACS’S EVALUATED COST. ON THIS BASIS, LABOR DECIDED THAT WICS WOULD RECEIVE THE AWARD. OUR IN CAMERA REVIEW OF SOURCE SELECTION DOCUMENTS SHOWS THAT NOTWITHSTANDING THE DECISION TO AWARD TO WICS, WICS’S PRICE EXCEEDED AVAILABLE FUNDING BY APPROXIMATELY $1,200. LABOR THEN REOPENED DISCUSSIONS WITH WICS PRIOR TO ACTUAL CONTRACT AWARD AND NEGOTIATED THE NECESSARY PRICE REDUCTION TO MEET AVAILABLE FUNDING LIMITS. THERE IS NO INDICATION IN THE RECORD THAT LABOR ADVISED JACS OF THE POST-BAFO NEGOTIATIONS WITH WICS.

INITIALLY, WE NOTE IT IS NOT OUR FUNCTION TO CONDUCT A DE NOVO REVIEW OF TECHNICAL PROPOSALS, NOR IS IT OUR FUNCTION TO INDEPENDENTLY DETERMINE THEIR RELATIVE MERIT, SINCE THE EVALUATION OF PROPOSALS IS PROPERLY THE FUNCTION OF THE PROCURING AGENCY. E-SYSTEMS, INC., B-191346, MAR. 20, 1979, 79-1 CPD PARA. 192. PROCURING AGENCIES ARE RELATIVELY FREE TO DETERMINE THE MANNER IN WHICH PROPOSALS WILL BE EVALUATED SO LONG AS THE METHOD SELECTED PROVIDES A RATIONAL BASIS FOR SOURCE SELECTION AND THE ACTUAL EVALUATION IS CONDUCTED IN ACCORDANCE WITH THE ESTABLISHED CRITERIA. SEE FRANCIS & JACKSON ASSOCIATES, 57 COMP.GEN. 224 (1978), 78-1 CPD PARA. 79. THUS, OUR FUNCTION IS NOT TO SELECT ONE OF SEVERAL PROPOSALS AS MOST ADVANTAGEOUS TO THE GOVERNMENT, BUT RATHER TO DECIDE WHETHER THE PROCURING AGENCY’S SELECTION HAS BEEN SHOWN TO BE LEGALLY OBJECTIONABLE. INTASA, B-191877, NOV. 15, 1978, 78-2 CPD PARA. 347. FINALLY, WHERE THERE IS AN IRRECONCILABLE CONFLICT BETWEEN THE AGENCY’S AND THE PROTESTER’S VERSIONS OF THE FACTS, IN THE ABSENCE OF PROBATIVE EVIDENCE (OTHER THAN STATEMENTS FROM EACH SIDE), WE MUST ACCEPT THE AGENCY’S VERSION OF THE FACTS. CONTRACT SUPPORT COMPANY, B-184845, MAR. 19, 1976, 76-1 CPD PARA. 184.

POST-BAFO NEGOTIATIONS AND GFP

WE HAVE RECOGNIZED THAT AGENCIES CONFRONTED WITH PROPOSAL PRICES IN EXCESS OF AVAILABLE FUNDING MAY PROPERLY CHANGE THE RFP’S STATEMENT OF WORK IN ORDER TO ESTABLISH A BASIS FOR THE LATER NEGOTIATION OF LOWER PRICES SO LONG AS ALL OFFERORS WITHIN THE COMPETITIVE RANGE ARE ADVISED OF THE CHANGE. B-161405, OCT. 2, 1967; CHRYSLER MOTORS CORPORATION, B-186600, SEPT. 29, 1976, 76-2 CPD PARA. 294. HOWEVER, AS A GENERAL RULE, IT IS IMPROPER FOR AN AGENCY, AFTER RECEIPT OF BAFO’S, TO REOPEN NEGOTIATIONS (EVEN IF THEY ARE CHARACTERIZED AS ONLY “TOUCH-UP” NEGOTIATIONS) WITH ONLY ONE OFFEROR WHERE OTHER OFFERORS REMAIN WITHIN THE COMPETITIVE RANGE BECAUSE EVERY OFFEROR WITHIN THE COMPETITIVE RANGE HAS THE RIGHT TO CHANGE OR MODIFY ITS PROPOSAL, INCLUDING PRICE, FOR ANY REASON WHATEVER, AS LONG AS NEGOTIATIONS REMAIN OPEN. UNIVERSITY OF NEW ORLEANS, 56 COMP.GEN. 958 (1977), 77-2 CPD PARA. 201. MOREOVER, WHEN THERE ARE SIGNIFICANT OR SUBSTANTIAL CHANGES IN THE GOVERNMENT’S REQUIREMENTS, FEDERAL PROCUREMENT REGULATIONS, 41 C.F.R. SEC. 3.805.1(D) (1983), REQUIRE:

“(D) WHEN, DURING NEGOTIATIONS, A SUBSTANTIAL CHANGE OCCURS IN THE GOVERNMENT’S REQUIREMENTS OR A DECISION IS REACHED TO RELAX, INCREASE, OR OTHERWISE MODIFY THE SCOPE OF THE WORK OR STATEMENT OF REQUIREMENT, SUCH CHANGE OR MODIFICATION SHALL BE MADE IN WRITING AS AN AMENDMENT TO THE REQUEST FOR PROPOSALS, AND A COPY SHALL BE FURNISHED TO EACH PROSPECTIVE CONTRACTOR.”

ABSENT A COMPELLING REASON, THIS REGULATION APPLIES TO A SIGNIFICANT OR SUBSTANTIAL CHANGE EVEN WHERE THE COMPETITIVE RANGE HAS BEEN REDUCED TO ONLY ONE OFFEROR. THUS, IF DURING FINAL DISCUSSIONS IT BECOMES OBVIOUS THAT THE CONTRACT REQUIREMENTS BEING NEGOTIATED WITH THE SOLE REMAINING OFFEROR DIFFER SIGNIFICANTLY FROM THE REQUIREMENTS STATED IN THE RFP, THE CONTRACTING OFFICER MUST AMEND THE RFP AND SEEK NEW OFFERS. COMPUTEK INCORPORATED, ONTEL CORPORATION, 54 COMP.GEN. 1080 (1975), 75-1 CPD PARA. 384.

APPLICATION OF THE FOREGOING RULES TO SPECIFIC CASES REQUIRES AN ASSESSMENT OF THE SIGNIFICANCE OF THE PROTESTED CHANGES IN TERMS OF THE RESULTING PREJUDICE TO OFFERORS OTHER THAN THE AWARDEE. WHERE THE PROTESTED CHANGE IS NOT PREJUDICIAL, THE PROTEST IS DENIED. SEE D&P TRANSPORTATION COMPANY, INC., B-190735, JULY 14, 1978, 78-2 CPD PARA. 37.

THE RECORD SHOWS THAT LABOR EXCLUDED JACS FROM THE POST-BAFO NEGOTIATIONS AND APPARENTLY ALTERED THE RFP’S GFP REQUIREMENTS DURING THE POST-BAFO NEGOTIATIONS. SPECIFICALLY, IT APPEARS THAT LABOR ESTABLISHED A CEILING PRICE AT THE LEVEL OF AVAILABLE FUNDING (APPROXIMATELY $1,200 BELOW WICS’S OFFER). LABOR THEN ALTERED THE RFP REQUIREMENTS BY SUBSTITUTING GFP FOR WHAT WAS PREVIOUSLY CONTRACTOR FURNISHED PROPERTY. THE GFP CONSISTED OF OFFICE SPACE, PHONE SERVICE, OFFICE FURNITURE/EQUIP (OFFICE GFP), AND APPARENTLY A LIST OF JACS’S VOLUNTEERS (LIST GFP). THE OFFICE GFP, IF VALUED AT THE PRICES SET OUT IN WICS’S COST PROPOSAL, WAS WORTH APPROXIMATELY $40,500. IT IS NOT KNOWN WHAT THE LIST GFP WAS WORTH TO WICS. ON THIS BASIS, WICS COULD HAVE REDUCED ITS PRICE $40,500; HOWEVER, BOTH PARTIES AGREED TO LIMIT THE PRICE REDUCTION TO THE $1,200 NECESSARY TO COME WITHIN THE AVAILABLE FUNDING. IF IT IS ASSUMED THAT LABOR NEGOTIATED A DOLLAR FOR DOLLAR REDUCTION FOR EACH ITEM OF GFP FURNISHED, THE OUTCOME WOULD HAVE BEEN A $39,300 BALANCE. THE RECORD DOES NOT SHOW THE EXACT AMOUNT OF THIS BALANCE. LABOR REFERS TO THE BALANCE AS “SAVINGS.” THE RECORD SHOWS THAT LABOR AND WICS AGREED THAT THE “SAVINGS” WOULD BE REALLOCATED WITHIN THE TOTAL BUDGET. IT IS NOT CLEAR WHETHER LABOR AND WICS HAD SPECIFIC WORK IN MIND TO WHICH THE SAVINGS WOULD BE REALLOCATED.

JACS’S ARGUMENT IS PREMISED UPON ITS KNOWLEDGE OF THE AWARD PRICE AND THE GFP FURNISHED TO WICS. JACS BELIEVES IT WAS PREJUDICED BY LABOR’S DECISION TO PROVIDE GFP BECAUSE IF IT HAD RECEIVED SIMILAR GFP, IT WOULD HAVE PROPOSED A PRICE BELOW THE AWARD PRICE. JACS VALUED THE OFFICE GFP AT $43,100 AND THE LIST GFP AT $44,900. JACS ARGUES THAT IT WOULD HAVE CUT ONE PROFESSIONAL STAFF POSITION IF LABOR HAD PROVIDED JACS WITH A LIST OF WICS’S VOLUNTEERS. JACS STATES THAT IT WOULD THEN HAVE HAD ACCESS TO A GROUP OF TRAINED VOLUNTEERS EXPERIENCED IN HANDLING THE PROBLEMS OF YOUNG WOMEN AND HAVE BEEN RELIEVED OF THE RESPONSIBILITY OF RECRUITING AND TRAINING SIMILAR VOLUNTEERS.

THE RECORD SHOWS THAT DURING NEGOTIATIONS, LABOR ASKED JACS TO JUSTIFY THE ADDITIONAL STAFF POSITION WHICH JACS NOW CLAIMS COULD HAVE BEEN ELIMINATED. IN ITS BAFO, JACS JUSTIFIED THE POSITION IN TERMS OF INCREASED WORKLOAD, PARTICULARLY IN RECRUITING VOLUNTEERS TO HANDLE THE EXPANSION OF SUPPORT SERVICES (PRE AND POSTNATAL CHILD CARE, FAMILY PLANNING, ETC.) TO FEMALE CORPS MEMBERS. LABOR ARGUES THAT BOTH WICS AND JACS PROPOSED AN EXTRA POSITION FOR THE DEVELOPMENT OF VOLUNTEERS AND THAT SINCE WICS, APPARENTLY WITH BENEFIT OF THE JACS VOLUNTEER LIST, HAS NOT BEEN ABLE TO REDUCE ITS STAFF, THERE IS NO REASON TO BELIEVE THAT JACS COULD REDUCE ITS STAFF WERE IT PROVIDED WITH A LIST OF WICS VOLUNTEERS.

IF IT IS ASSUMED THAT THE LIST GFP HAD NO VALUE TO WICS AND THAT WICS WOULD HAVE OFFERED A DOLLAR FOR DOLLAR PRICE REDUCTION EQUAL TO THE VALUATION OF THE OFFICE GFP FOUND IN ITS PROPOSAL, THEN WICS’S EVALUATED PRICE WOULD BE APPROXIMATELY $8,300 BELOW JAC’S EVALUATED PRICE (USING JAC’S FIGURES).

IN OUR VIEW, THERE IS REASON TO BELIEVE THAT JACS MIGHT HAVE REDUCED ITS STAFF, AS IT CLAIMS, HAD IT BEEN FURNISHED THE WICS VOLUNTEER LIST. JACS AND WICS ADDED THE STAFF POSITIONS IN QUESTION FOR DIFFERENT REASONS: JACS TO GAIN VOLUNTEERS; AND WICS TO DECENTRALIZE ITS PROFESSIONAL STAFF. POSSESSION OF THE WICS VOLUNTEER LIST MIGHT HAVE SUBSTANTIALLY REDUCED JACS NEED TO RECRUIT AND TRAIN VOLUNTEERS SINCE WICS VOLUNTEERS WERE TRAINED, EXPERIENCED AND IN PLACE. THERE IS NOTHING IN THE RECORD INDICATING THAT JACS HAD A DECENTRALIZATION PROBLEM SIMILAR TO WICS AND WOULD FOR THAT REASON HAVE BEEN PREVENTED FROM ELIMINATING THE POSITION IN QUESTION. WE CANNOT DETERMINE EXACTLY WHAT JACS WOULD HAVE DONE HAD IT BEEN ADVISED OF EITHER THE SUBSTITUTION OF OFFICE GFP OR OF THE REALLOCATION OF ANY “SAVINGS,” RESULTING FROM ANY JACS PRICE REDUCTION BELOW THE CEILING PRICE TO OTHER PARTS OF ITS BUDGET. HOWEVER, BOTH JACS AND WICS WERE SUBSTANTIALLY EQUAL TECHNICALLY. IT IS ARGUABLE THAT, IF JACS HAD BEEN NOTIFIED OF THE GFP SUBSTITUTION AND AFFORDED AN OPPORTUNITY TO NEGOTIATE A PRICE REDUCTION, JACS COULD HAVE SUBSTANTIALLY REDUCED THE DIFFERENCE BETWEEN THE TWO OFFERS. WE THINK IT WOULD BE SPECULATIVE TO TRY AND PREDICT WHETHER JACS’S PRICE REDUCTION IN THOSE CIRCUMSTANCES WOULD HAVE EXCEEDED WICS’S, BEARING IN MIND THAT THE EXACT MAGNITUDE OF THE WICS REDUCTION DOES NOT APPEAR IN THE RECORD BEFORE US. CONSEQUENTLY, WE CANNOT FIND THAT JACS WAS NOT PREJUDICED BY LABOR REOPENING NEGOTIATIONS WITH ONLY WICS.

WE THEREFORE SUSTAIN THE PROTEST. WE RECOMMEND THAT LABOR REOPEN NEGOTIATIONS WITH BOTH JACS AND WICS WITH A CLEAR STATEMENT OF ITS MINIMUM REQUIREMENTS. SHOULD JACS’S OFFER PROVE THE BETTER, WICS’S CONTRACT SHOULD BE TERMINATED FOR THE CONVENIENCE OF THE GOVERNMENT AND AWARD MADE TO JACS. BECAUSE WE HAVE SUSTAINED THE PROTEST ON THE BASIS OF JACS’S FIRST CONTENTION, WE WILL NOT CONSIDER THE BALANCE OF JACS’S PROTEST.

SINCE THIS DECISION CONTAINS A RECOMMENDATION THAT CORRECTIVE ACTION BE TAKEN, WE ARE FURNISHING COPIES TO THE SENATE COMMITTEES ON GOVERNMENTAL AFFAIRS AND APPROPRIATIONS AND THE HOUSE COMMITTEES ON GOVERNMENT OPERATIONS AND APPROPRIATIONS IN ACCORDANCE WITH SECTION 236 OF THE LEGISLATIVE REORGANIZATION ACT OF 1970, 31 U.S.C. SEC. 720, AS ADOPTED BY PUBLIC LAW 97-258 (FORMERLY 31 U.S.C. SEC. 1176 (1976)), WHICH REQUIRES THE SUBMISSION OF WRITTEN STATEMENTS BY THE AGENCY TO THE COMMITTEES CONCERNING THE ACTION TAKEN WITH RESPECT TO OUR RECOMMENDATION.

More from:

News Network

  • Defense Science and Technology: Opportunities to Better Integrate Industry Independent Research and Development into DOD Planning
    In U.S GAO News
    Why This Matters Research and development (R&D) projects in high-tech areas like cybersecurity and biotechnology can help the U.S. military reassert its technological edge. Contractors decide what independent R&D projects to conduct and the Department of Defense (DOD) reimburses them about $4 billion-$5 billion annually. More information about those projects could help DOD guide its own R&D investments. Key Takeaways DOD does not know how contractors’ independent R&D projects fit into the department’s technology goals. As a result, DOD risks making decisions about its multi-billion dollar science and tech investments that could duplicate work or miss opportunities to fill in gaps that the contributions of private industry do not cover. DOD has a database of independent R&D projects, but it is not very useful for informing investment decisions because DOD does not obtain information in these and other areas: Priority. Contractors do not identify whether a project aligns with any of 10 modernization priorities. The department uses those priorities to make decisions about R&D investments. Cost. The database does not capture a project’s complete cost, which could help DOD understand cost implications of future related work. Innovation. The database does not include whether a project is a lower-risk, incremental development or a more innovative “disruptive” technology. Disruptive projects carry higher risk of failure but offer possible significant rewards in the long term. While DOD is not required to review independent R&D projects to understand how they support DOD’s priorities, GAO analysis showed 38 percent of industry projects aligned with DOD’s priorities. To help DOD better understand the scope and nature of independent projects, we recommend DOD determine whether to require additional information in the project database and review projects annually as part of its strategic planning process. DOD agreed with both recommendations. How GAO Did This Study We categorized a sample of completed projects from 2014–2018 by innovation type and analyzed projects completed in 2018 for alignment with DOD's modernization priorities. We also reviewed DOD policies on independent R&D and interviewed representatives from 10 defense contractors. For more information, contact Timothy J. DiNapoli at (202) 512-4841 or dinapolit@gao.gov.
    [Read More…]
  • West Virginia Man Charged with Federal Civil Rights Offenses
    In Crime News
    A federal grand jury in West Virginia returned an indictment Tuesday charging a former West Virginia police officer and firefighter with civil rights offenses against two victims, using fire to commit a felony, and witness tampering.
    [Read More…]
  • Secretary Antony J. Blinken With Jonathan Karl of This Week with George Stephanopoulos on ABC
    In Crime Control and Security News
    Antony J. Blinken, [Read More…]
  • Department Press Briefing – July 7, 2021
    In Crime Control and Security News
    Ned Price, Department [Read More…]
  • Hong Kong Travel Advisory
    In Travel
    Reconsider travel to the [Read More…]
  • Departments of Justice and Homeland Security Release Data on Incarcerated Aliens
    In Crime News
    Today, the Department of Justice and the Department of Homeland Security released the Alien Incarceration Report for Fiscal Year 2019.  The data shows that 94 percent of confirmed aliens incarcerated in Federal Bureau of Prisons (BOP) and United States Marshals Service (USMS) facilities were unlawfully present in the United States.  Additionally, the report found that nearly 70 percent of known or suspected aliens in BOP custody had been convicted of a non-immigration-related offense, and 39 percent of known or suspected aliens in USMS custody had committed a non-immigration-related offense.
    [Read More…]
  • Termination of PRC-Funded Propaganda Programs
    In Crime Control and Security News
    Michael R. Pompeo, [Read More…]
  • Justice Department Reaches Landmark Agreement with Massachusetts Department of Children and Family to Address Discrimination Against Parents with Disabilities
    In Crime News
    The Departments of Justice and Health and Human Services (HHS) announced today that they reached a landmark agreement with the Massachusetts Department of Children and Families (DCF).  
    [Read More…]
  • Joint Statement on Afghanistan Evacuation Travel Assurances
    In Crime Control and Security News
    Office of the [Read More…]
  • Five Charged in Scheme to Export Thermal Imaging Scopes and Night Vision Goggles to Russia, in Violation of Arms Export Control Act
    In Crime News
    A federal grand jury in Los Angeles unsealed an indictment Thursday that accuses five defendants of conspiring to unlawfully export defense articles to Russia. Specifically, the defendants allegedly exported thermal imaging riflescopes and night-vision goggles without a license, in violation of the Arms Export Control Act.
    [Read More…]
  • Secretary Pompeo’s Call with Mongolia’s President Battulga
    In Crime Control and Security News
    Office of the [Read More…]
  • Justice Department Files Lawsuit Against the State of Alabama for Unconstitutional Conditions in State’s Prisons for Men
    In Crime News
    Today, the Justice Department filed suit against the State of Alabama and the Alabama Department of Corrections. The complaint alleges that the conditions at Alabama’s prisons for men violate the Constitution because Alabama fails to provide adequate protection from prisoner-on-prisoner violence and prisoner-on-prisoner sexual abuse, fails to provide safe and sanitary conditions, and subjects prisoners to excessive force at the hands of prison staff. 
    [Read More…]
  • Gang “enforcer” sentenced for trafficking a large amount of stolen marijuana
    In Justice News
    A Rio Grande City man [Read More…]
  • Veterans Justice Outreach Program: Further Actions to Identify and Address Barriers to Participation Would Promote Access to Services
    In U.S GAO News
    What GAO Found In response to the Veterans Treatment Court Improvement Act of 2018, Department of Veterans Affairs (VA) data show the agency hired 51 Veterans Justice Outreach (VJO) specialists, though VA completed its hiring and reporting after the statute's deadline. The program relies on nearly 400 VJO specialists—primarily social workers—who work with jails and municipal courts to identify and assess the needs of arrested or incarcerated veterans, and connect them to VA health care services. In addition, VA's reporting to Congress lacked required information, such as the number of veterans who lack access to VJO specialists. Although VA does not collect these data, VJO program officials said that future research will help them estimate this number. VA has identified and taken some steps to address barriers that veterans may face in accessing VJO specialists and receiving services. GAO additionally found that veterans with other-than-honorable discharges—often at greater risk of mental health issues and suicide—may not know they are eligible under a 2020 VA policy that extends mental health care services to certain members of this subgroup. (See figure.) In addition, this policy change and newly available services are not reflected in training for VJO specialists. As a result, veterans may not meet with VJO specialists and miss an opportunity to get help accessing VA's health care services. Barriers Justice-Involved Veterans (JIV) May Face Accessing VJO Specialists VA and others have conducted research on the use of VA services by veterans in the VJO program, and VA officials have used this research to improve the program by educating staff and further directing their research. However, VJO research and improvement efforts are not guided by project plans that define goals and identify needed resources, such as stakeholder expertise, as called for by generally recognized project management practices. VJO officials told GAO that research is a key strategy for improving VJO services and that they intend to develop a plan, but do not have a timeframe for doing so. Until the VJO program develops detailed project plans that also identify needed resources, program officials will not have a road map to improve the use of VA services by veterans in the VJO program. Why GAO Did This Study Veterans who have been arrested and jailed are at an increased risk of homelessness, mental health conditions, and suicide. To address these concerns and prevent re-incarceration, VA created the VJO program, which served over 30,000 veterans in fiscal year 2020. The Veterans Treatment Court Improvement Act of 2018 included a provision for GAO to assess VA's implementation of the act's requirements. This report examines the extent to which VA has (1) implemented the act's hiring and reporting requirements, (2) identified and addressed barriers that veterans face in accessing VJO specialists, and (3) conducted and used research to improve the use of VA services by veterans in the program. GAO reviewed relevant federal laws and VA documentation, including program guidance, policies, plans, and reports; reviewed selected studies on veterans' use of the VJO program; interviewed VA and VJO officials; and analyzed VA data for fiscal years 2016 through 2020 on veterans served by the program.
    [Read More…]
  • Remarks at the Ministerial on Climate Action
    In Climate - Environment - Conservation
    John Kerry, Special [Read More…]
  • Former Mississippi Police Officer Pleads Guilty to Excessive Force Charge
    In Crime News
    The Justice Department announced today that a former officer with the Meridian, Mississippi Police Department pleaded guilty to using excessive force against a man during a vehicle stop and arrest. 
    [Read More…]
  • Steel and Aluminum Tariffs: Commerce Should Improve Its Exclusion Request Process and Economic Impact Reviews
    In U.S GAO News
    The Department of Commerce (Commerce) has a four-phase process to review companies' requests to be excluded from having to pay Section 232 steel and aluminum tariffs. Commerce ensures an exclusion request is complete, accepts public input, evaluates materials submitted, and issues a final decision. Between March 2018 and November 2019, Commerce received over 106,000 requests; it rejected over 19,000 of them prior to decision due to incorrect or incomplete information. Although rejections may delay relief for requesters and can increase work for Commerce, the agency has not identified, analyzed, or taken steps to fully address the causes of these submission errors. In deciding exclusion requests, Commerce examines objections from steel and aluminum producers to find whether the requested products are reasonably available domestically in a sufficient amount. Commerce may also decide exclusion requests based on national security issues, but has not done so. While Commerce approved two-thirds of exclusion requests, it most often denied requests that had technical errors or where a domestic producer had objected. Commerce did not decide about three quarters of requests within its established timeliness guidelines, as shown in the figure, taking more than a year to decide 841 requests. Commerce took steps to improve timeliness, such as streamlining the review process for some requests and creating a new submission website, but continues not to meet guidelines and had a backlog of 28,000 requests as of November 2019. Until Commerce takes additional steps, companies will continue to encounter delays in obtaining relief. Most Steel and Aluminum Exclusion Decisions Did Not Meet the Department of Commerce's Established Timeliness Guidelines from March 2018 to November 2019 Commerce has not documented the results from any reviews of the tariffs' impacts or assigned responsibility for conducting regular reviews. GAO found evidence of changes in U.S. steel and aluminum imports and markets. For example, imports covered by the tariffs declined after an initial surge and prices dropped after significant increases in earlier years. Evaluating whether the tariffs have achieved the intended goals and how they affect downstream sectors requires more in-depth economic analysis. Without assigning responsibility for conducting regular reviews and documenting the results, Commerce may be unable to consistently assess if adjustments to the tariffs are needed. Citing national security concerns over excess global supply of steel and aluminum, in March 2018 the President placed tariffs on the import of some products using Section 232 of the Trade Expansion Act of 1962. At the President's direction, Commerce established a process to provide relief, or exclusion, from the tariffs. GAO was asked to review Commerce's Section 232 tariff exclusion process. This report assesses (1) the process Commerce uses to decide exclusion requests and to what degree it has accepted submitted requests; (2) what criteria and factors affected Commerce's decisions; (3) how often Commerce met established guidelines for the timely resolution of requests; and (4) the extent to which Commerce reviewed the impacts of the tariffs on steel and aluminum imports, as directed. GAO analyzed Commerce's Bureau of Industry and Security and International Trade Administration records from March 2018 to November 2019, as well as data from the U.S. Census Bureau and the Department of Homeland Security, and spoke with agency officials. GAO recommends that Commerce (1) identify, analyze, and respond to factors in the process that may cause submission errors; (2) take steps to improve timeliness of exclusion request decisions and address the backlog; and (3) assign responsibility for reviewing the tariffs' impact and document the results. Commerce concurred with all three recommendations. For more information, contact Kimberly Gianopoulos at (202) 512-8612 or GianopoulosK@gao.gov .
    [Read More…]
  • Designation of Al-Qa’ida-Linked Financial Facilitators
    In Crime Control and Security News
    Antony J. Blinken, [Read More…]
  • Briefing with Special Envoy for the Northern Triangle Ricardo Zuniga on Ongoing Diplomatic Efforts to Address the Root Causes of Irregular Migration from Central America
    In Crime Control and Security News
    Ricardo Zuniga, Special [Read More…]
  • Qatar Travel Advisory
    In Travel
    Reconsider travel [Read More…]
Network News © 2005 Area.Control.Network™ All rights reserved.